New Choiseul Secondary school to commence soon

New Choiseul Secondary school to commence soon

The Construction of two (2) three (3) new classroom blocks to provide new accommodation for the Choiseul Secondary School has moved one step closer as the Invitation for Bids notice has been advertised. This comes as very good news for the teachers, students, and parents of students attending the Choiseul Secondary School.

The need for this project arose when following the 2007 Earthquake, Hurricane Tomas and other natural events of the past few years, damage to blocks B and C at that institution caused those buildings to become structurally unsound.

The two (2) new three (3) story buildings will accommodate 12 classrooms, Sickbay with toilet facilities, resource room, Technical Drawing Room, students ‘ washrooms, Information Technology Lab, Electronic Document Preparation and Management Laboratory, Physics and Chemistry laboratories with prep room, music room and theatre room. The total construction area is approximately 34,330.95 sq. ft.

This project is one of many similar projects being undertaken under the Disaster Vulnerability Reduction Project (DVRP). The DVRP programme is funded by the World Bank, and its objectives are to measurably reduce St. Lucia’s vulnerability to natural hazards and climate change impacts through urgent risk mitigation measures and by strengthening St. Lucia’s capacity to understand and manage disaster risks.

Bidding will be conducted through the National Competitive Bidding procedures as specified in the World Bank’s Guidelines. Interested bidders can obtain additional information from the Project Coordination Unit of the Department of Planning and National development, 5th Floor Conway Business Centre, Waterfront, Castries. The deadline for receipt of bids is February 23rd 2016.

Related Articles

1 Comment

  1. Uh huh
    January 7, 2016 at 4:38 pm Reply

    That school is a disaster waiting to happen. New buildings had been promised a long time ago. The school was overlooked when all these new schools were being built. Schools that cannot even get a full form one class. It had to take a child being shocked to invite bids. (Edited for coarse language)

Leave a Reply