Cul De Sac Valley Flood Mitigation Project – Axle Load Survey

Cul De Sac Valley Flood Mitigation Project – Axle Load Survey

PRESS RELEASE:-The Department of Infrastructure, Ports and Energy wishes to inform the motoring public that an axle load survey as part of the Cul De Sac Valley Mitigation Project will be undertaken on Wednesday, August 10, 2016 from 8:00am to 6:00pm at Odsan along the East Coast Road within the parking lot of Valley Basket.

The exercise will be conducted by the Department of Infrastructure, Ports and Energy with the assistance of the Police and will involve the weighing of heavy equipment and trucks.

All heavy equipment and trucks travelling along that road will be pulled over into the parking to be weighed.

Commuters are asked to be guided by road signs which will be placed for their information and guidance. Heavy goods vehicles and trucks are particularly asked to be vigilant and kindly comply with the police instructions to leave the highway and pull into the area of study.

The Department of Infrastructure, Ports and Energy apologizes for any inconveniences which may be caused during the exercise.

Related Articles

1 Comment

  1. lonan
    August 10, 2016 at 2:01 pm Reply

    why this has to be anounced? overloading testing of heavy trucking (what causes damage to the structure of road and safety aspects) should be done without notice to get the real figures.

Leave a Reply

Shares