Friday, September 30, 2022

Excavator Mishap Causes Power Outages, Traffic Backlog At Laborie

- Advertisement -

On Monday afternoon, a crew from the St Lucia Electricity Services Limited (LUCELEC) was restoring power lines along the Laborie Highway after a vehicle carrying an excavator pulled them down.

The incident created a massive traffic backlog during the afternoon rush hour.

LUCELEC Corporate Communications Manager Roger Joseph explained that about 2:55 pm, the top of the excavator became entangled in overhead wires.

- Advertisement -

He disclosed that internet and cable wires are usually lower on the utility pole, while LUCELEC wires are above.

Joseph toldĀ St Lucia Times that the excavator accident pulled down and broke the pole in three places, leaving some residents between the Augier Gap and past Laborie without power.

But he said LUCELEC workers were quickly on the scene and reconfigured the network, restoring power to most customers.

At about 5:46 pm, the LUCELEC official stated that Laborie Village and Banse were without electricity.

Nevertheless, Joseph told St Lucia Times that workers had already cleared the road, were replacing broken wires and cables and seeking to restore power to parts of Laborie in the shortest possible time.

- Advertisement -
Editorial Staff
Editorial Staff
Our Editorial Staff at St. Lucia Times is a team publishing news and other articles to over 200,000 regular monthly readers in Saint Lucia and in over 150 other countries worldwide.

1 COMMENT

Comments are closed.

TRENDING

Subscribe to our St. Lucia Times Newsletter

Get our headlines emailed to you every day.

spot_img
Send this to a friend